| |
|
|
Helen Arnold CLC
Project
Summit Construction had the General Trades package along with
the Sitework package on this 16 month $ 2,885 M project. The
Helen E. Arnold Community Learning Center is a two-story
educational facility. The masonry veneer wraps the exterior in
two rich, natural brick shades. A sweeping curve on the west
side of the building envelops the administrative suite, media
center and art room. The curve is penetrated by the main
entrance and leads to a corridor bathed in sunlight courtesy of
clerestory windows. From this corridor, students can access the
8,000-square-foot gymnasium and student dining areas.
|
 |

|
|
|