| |
|
|
Jennings CLC
Project
The new, three-story Jennings Community Learning Center was
built north of the existing school along Dayton Street. The
modern look of the exterior includes glass and masonry and
features a two-story atrium allowing light to flow into the
lower level. The lower level includes a gym, student dining
room, music room and mechanical spaces. It will house
classrooms, a media center, art rooms and administrative
offices. The second floor contains regular classrooms and
life-skill labs. The new CLC includes stone medallions and a
stone "surround" from the west entry of the old Jennings Middle
School.
|
 |

|
|
|