Madison-Plains Local School District New K-12 School Project
Project Address: 55 Linson Road
Project Schedule:
Construction Notice to Proceed: August 2026
Substantial Completion: January 2029
Bid Timeline: Insert here
Project Description:
As part of Segment One, partially build one new elementary/middle/high school for the entire PK–5 and 9–12 student population. The overall building square footage is 127,400 sf and breaks down as follows: elementary school = 58,724 sf, middle school = 4,600 sf (common area only) and high school = 64,076 sf. The overall career tech space is 13,583 sf which breaks down as follows: core space = 7,315 sf and program space = 6,268 sf.
Invitation to Bid:
We invite subcontractors already prequalified by Summit Construction and new vendors in the London and Madison county regions to bid this project.
*Please review our Prequalification Form here.
Trades Needed/ Scopes of Work:
| Concrete |
| Precast Concrete |
| Masonry |
| Structural Steel & Metal Fabrications |
| Cold-Formed Metal Framing, Trusses, and Exterior Sheathing |
| Rough Carpentry Blocking and Backing |
| Waterproofing |
| Intumescent Fire Protection |
| Spray Applied Insulation |
| Expansion Joint Cover Assemblies |
| Membrane Roofing |
| Metal Roof System |
| Caulking |
| Doors/Frames/Hardware - Material |
| Doors/Frames/Hardware - Installation |
| Coiling Counter Doors |
| Overhead Doors, Sectional and Coiling |
| Entrances, Storefronts, Glass & Glazing |
| Safety and Security Films |
| Metal Framing & Drywall, Ceilings |
| Resilient Flooring and Carpet |
| Epoxy Floor Coatings |
| Hard Tile Floors and Walls |
| Acoustic Treatments - Panels and Baffles |
| Painting and Coatings |
| Visual Display Boards |
| Directories, Painted Supergraphics, Plaques, Dimensional Letters, Panel Signage, and Post and Panel/Pylon Signage |
| Fire Extinguishers & Cabinets, Emergency Aid Specialties |
| Toilet Partitions and Toilet Accessories, Cubicle Curtains & Tracks |
| Lockers |
| Wire Mesh Partitions |
| Wall and Door Protection |
| Flagpole |
| Kitchen Equipment |
| Athletic/Gym Equipment |
| Kiln and Education Equipment |
| Playground Equipment |
| Window Shades |
| Casework, Countertops, and Solid Surface Shower Enclosure |
| Telescoping Stands |
| Greenhouse |
| Elevator |
| Fire Protection |
| Plumbing |
| Mechanical |
| HVAC Controls |
| Electrical & Fire Alarm |
| Structured Cabling |
| Audio, Visual, and Sound Systems |
| Security and Access Controls |
| Earthwork and Utilities |
| Tree Clearing |
| Soil Stabilization |
| Asphalt Paving, Striping, and Markings |
| Landscaping and Seeding |
| Fencing |
Architect: Schorr Architects
Renderings:

CMR Project Management Lead: Adam Huwer, Summit Construction
CMR Preconstruction Lead: Scott Montgomery, Summit Construction
For additional questions or clarifications about this project, please contact:
Scott Montgomery
Contact
Andy Rogers
Contact