Smithers RAPRA

Renovation

Location

Ravenna, OH

Project Type

Industrial

Year

2016

Sq. Footage

500

Months to Complete

2

Smithers Rapra has become a global leader in rubber, plastics and polymer testing, consulting services, and conferences, training, publications and market reports, focused mainly on the tire, industrial, automotive, consumer and medical.

Summit Construction was brought in to isolate tire testing machines to provide conditioned air required for tire testing. The services required for this project include: demolition of the existing structure, excavate and pour equipment pads, provide and install bollards, metal stud framing, insulation and plywood sheathing, paint, and provide and install doors/frames/hardware. This was an imperative project for Smithers because the conditioned air can more accurately test the tires durability.